
Resin Bound Driveways
A smooth, permeable, hand-trowelled finish in a wide range of aggregate blends, installed over a prepared base.
Explore resin bound drivewaysDriveway installers · London
Block paving suits everything from a 1930s semi to a modern forecourt. We lay concrete and clay blocks on a compacted, well-drained base, with bonds, borders and kerbs set out to suit your property.
Block paving is made up of individual concrete or clay blocks laid on a bed of sharp sand over a compacted sub-base, then locked together with kiln-dried jointing sand. Because each block is separate, the surface can flex slightly with the ground and individual blocks can be lifted and relaid if a repair is ever needed.
It is a strong choice where vehicles turn and park every day, and where you want a border, a pattern or a colour change to define parking, paths and planting.
Standard block paving has tight joints, so water runs off the surface to a drain, channel or soft landscaping.
Permeable block paving has wider joints filled with fine aggregate and sits on an open-graded sub-base, so rainwater soaks through.
For front gardens over 5m², surface water planning rules apply. We'll explain the options at survey.
Benefits
Designed to carry cars and vans when laid on the right sub-base.
Individual blocks can be lifted and relaid after drainage or utility work.
Herringbone, basketweave and stretcher bonds with contrasting borders.
Permeable systems available where surface water needs managing.
Charcoal, brindle, buff and natural tones in concrete or clay.
Kerbs, steps and edges finished neatly against brickwork and lawns.
Uses
Options
Concrete blocks, tumbled blocks or clay pavers.
Herringbone for driveways under traffic; other bonds for paths and borders.
Single colour, blends, or a contrasting border and feature bands.
Standard laid to falls, or a permeable system.
Samples are brought to the survey. Colours on screen are indicative only.
Groundwork
Most block paving problems – sinking, rutting and loose blocks – come from a thin or poorly compacted sub-base. We dig out to the depth the ground and traffic need, install a compacted sub-base, and set edge restraints so the blocks cannot creep.
Installation process
We check levels, drainage, access and existing services.
Itemised quotation covering excavation, base, edging and blocks.
Old surface removed and dug out to depth.
Sub-base compacted in layers; kerbs and edges concreted in.
Blocks laid to pattern and cut neatly at edges and around covers.
Jointing sand brushed in, surface compacted and cleaned.
A typical domestic block paving driveway takes around four to eight working days, depending on size, the depth of excavation, the amount of cutting and access for removing spoil.
Brush regularly, top up jointing sand if it washes out, and treat weeds early. A sealant can be applied to help resist staining – we'll explain the pros and cons.
Project gallery
Gallery images are royalty-free placeholders and do not show Pavdrive installations.






Cost factors
Every site is different, so we don’t publish set prices. After a free site survey you’ll receive an itemised quotation showing exactly what is included.
Curves and irregular shapes increase cutting time.
Ground conditions and traffic determine how deep we dig.
Concrete, tumbled or clay blocks vary in cost.
Herringbone, feature bands and borders affect labour.
Channel drains, soakaways or a permeable system.
Skip placement, grab lorries and spoil volume.
FAQs
Herringbone is generally recommended where cars turn and brake because the interlock resists movement. Other bonds suit paths and borders.
If you are surfacing a front garden over 5m² and water cannot run to a permeable area within your property, a permeable surface is usually needed to stay within permitted development. Check your situation with the council; we'll advise at survey.
Usually because the sub-base was too thin or not compacted properly, or edges were not restrained. Groundwork is where we spend the time.
Yes. Individual blocks can be lifted and relaid, which is useful after drainage or utility work.
It depends on the base, traffic and maintenance. A properly built sub-base and edge restraint are what give block paving a long service life.
Other services

A smooth, permeable, hand-trowelled finish in a wide range of aggregate blends, installed over a prepared base.
Explore resin bound driveways →
Reinforced concrete with an imprinted pattern and colour, sealed for a durable, low-maintenance surface.
Explore imprinted concrete →
Natural stone and porcelain paving laid on a properly compacted sub-base, with edging, levels and falls set for drainage.
Explore driveway paving →London coverage
We survey and install throughout Greater London. If your postcode is close by but not listed, ask us – we’ll tell you straight away whether we can help.
Boroughs we regularly cover
Free site survey
Tell us about your driveway and we’ll arrange a site survey and an itemised written quotation. Prefer to talk?